Request the property package
IndustrialAvailable for sale / lease

Build, expand or lease in San Luis Potosí, Mexico

  • Power on site
  • Room to expand
  • Income from day one

4,061.82 m² of industrial land with a 542.45 m² plant in operating condition, an on-site substation and open reserve land for expansion. Free and clear, with the 2026 property tax paid.

Av. Comisión Federal de Electricidad 625, Zona Industrial, 78395 San Luis Potosí, S.L.P., Mexico · 22°03′54.1″ N, 100°52′39.9″ W

Land
4,061.82m²
43,721 sq ft, surveyed
Building
542.45m²
5,839 sq ft on 2 levels
Power available
180kVA
Substation on site
Zoning
Industrial
Established district
01The property

A working plant on a long industrial lot

4,061.82 m² (43,721 sq ft) on Av. Comisión Federal de Electricidad, between CFE 134 and CFE 136, in the center of the San Luis Potosí industrial district.

The 542.45 m² (5,839 sq ft) building includes a production area, a warehouse, offices on two levels, a guard house and a terrace. The plant, the finished offices and the guard house are in operating condition.

The balance of the site is open reserve land, suitable for expanding the building or adding a maneuvering yard. A leased telecom tower on the reserve land generates income that transfers with the property.

Aerial view with the site boundary outlined
Site boundary per topographic survey TOP023
  • 180 kVASubstation on site, medium voltage
  • Natural gasAvailable (Energy)
  • WaterMunicipal plus treated water
  • TelecomAlestra, Telcel, Starlink
  • AccessAv. CFE, Eje 134, Hwy 57
  • TitleFree and clear
Request the property package
Technical specifications
Land4,061.82 m² surveyed; 4,029.29 m² per deed
Building542.45 m²: production area, warehouse, offices on 2 levels, guard house, terrace
Reserve landThe rest of the site, ready for building expansion or a maneuvering yard
Substation on siteYes
Power available180 kVA
Substation capacity75 kVA
ServiceMedium voltage
kVA rightsNo cost
Natural gasAvailable (Energy)
WaterMunicipal supply; treated water available
SewerCombined sanitary and storm line tied into the municipal system
TelecomAlestra, Telcel, Starlink
Paving10 cm reinforced concrete
Location
AddressAv. Comisión Federal de Electricidad 625, Zona Industrial, 78395 San Luis Potosí, S.L.P., Mexico
Coordinates22°03′54.1″ N, 100°52′39.9″ W
Access roadsAv. CFE, Eje 134, Highway México 57
NearbyTres Naciones and Millennium industrial parks, 3M
Adjacent businessesYesera Potosina, Proyectos y Calderería, Sistemas y Manufacturas Agroindustriales
Elevation1,866.5 – 1,867.7 m above sea level; essentially flat
Who this site fits

Six ways to put the site to work

Production floor of the CFE 625 plant

Manufacturers entering Mexico

Power, gas, water and an industrial address already in place. Start with a plant, not a permit queue.

Reserve land behind the plant

Expanders

Keep the existing plant running and build out onto the reserve land behind it.

Aerial view of the lot

Redevelopers

A flat, surveyed 4,061.82 m² lot with about 30 m of frontage, ready for a larger building.

Grounds and courtyard at CFE 625

Land investors

Industrial land in an established district, free and clear, with a recent topographic survey on file.

Full-height loading door

Companies relocating to San Luis Potosí

Operations next to the state's industrial parks, on Av. CFE minutes from Highway 57.

Front of the plant on Av. CFE

Companies already in San Luis Potosí

A second site or added capacity in the same district.

Inside the plant

Production floor, finished offices, a full-height loading door

03What could be built

Room to build or expand

About 1,100 m² of open land in front of the plant and about 1,450 m² behind it.

Drone view of the site todaySite today · illustration

Starting point

A 542.45 m² plant on a 30 × 133 m lot: about 1,100 m² open in front, about 1,450 m² open at the rear, with the leased telecom tower in the rear corner. Areas measured from the survey site plan (T101).

Expand the plant
Concept rendering

Build-out forward

A new production bay on the roughly 1,100 m² in front of the plant, with roll-up doors and a concrete forecourt on Av. CFE.

Concept rendering

Build-out backward

A long bay on the roughly 1,450 m² behind the plant, ending in a truck yard with dock doors.

Subdivide for rent
Concept rendering

Keep the plant, add mini bodegas

The plant stays as it is. Five small rental units, about 150 m² each, go on the open land at the rear.

Concept rendering

Tear down, build 3 naves

Clear the site and build 3 naves of about 880 m² each (22 × 40 m) on a shared truck aisle. Small units listed in the Zona Industrial and La Pila run about 535–1,000 m².26

Concept renderings are illustrations generated from photos of the site. They are not designs, permits or commitments. Any build-out needs its own design and municipal approval.

Reserve land with the leased telecom tower
04Income on day one

Income from day one

A telecommunications tower on the reserve land is under an active lease. The lease transfers with the property.

  • Leased telecom tower on the reserve land
  • The lease and its income transfer to the new owner
  • The rest of the reserve land stays open for building or a yard

Lease terms are shared one-on-one with qualified buyers.

Request the property package
05Site plan and boundaries

GPS-surveyed and modeled in BIM

A GPS topographic survey of the full 4,061.82 m² lot and a BIM model of the plant by Eudainomics BIM Studio: floor plans, elevations, sections and a 3D site model.

Site plan
Site planPlant at the front, reserve land and telecom tower at the rear
Ground floor plan
Ground floorProduction area, warehouse, offices, locker rooms
Second floor plan
Second floorPrivate office, office area, meeting room, terrace
3D model of the site
3D site modelPlant, grounds and telecom tower
Aerial view with the site boundary
Aerial viewThe lot runs back from Av. CFE
Land polygon with bearings and distances
Polygon4,061.82 m², drawing C101, WGS84 / UTM 14Q
Boundaries and dimensions
SideBearingDistance
V1 – V2N 63°41′14″ E132.86 m
V2 – V3N 26°33′27″ W30.27 m
V3 – V4S 63°53′11″ W133.46 m
V4 – V1S 27°39′45″ E30.75 m
Surveyed area4,061.82 m²
Area per deed4,029.29 m²

GPS survey tied to the ISLP reference station, WGS84 datum, UTM zone 14Q projection (EPSG 32614). The 32.53 m² difference from the deed corresponds to a strip not recorded in the title; drawing C102 documents the polygon comparison.

Architectural drawings and topographic survey: Eudainomics BIM Studio, Arq. Fernando Puga Nava, reference TOP023, October 21, 2024.

07Why San Luis Potosí

In the middle of Mexico's industrial corridor

San Luis Potosí sits between Mexico City, Monterrey and the US border on Highway 57.

Industrial neighbors

GM, BMW, Bosch, Valeo and more, within 12 km

3M is on the same avenue. Cummins, Mabe, Continental and Bosch are in the same Zona Industrial. GM and BMW are a short drive south on Highway 57.

    Straight-line distances. 3M and Dräxlmaier locations approximate. Logos shown for location only.1–10

    State investment under Governor Ricardo Gallardo

    New transit, rail and bridges around the Zona Industrial

    New RedMetro electric busesPhoto: Gobierno del Estado de San Luis Potosí
    5 lines · free

    RedMetro bus network

    The state system runs 5 free lines in the metro area. Line 1 serves Eje 128 in the Zona Industrial.27

    Signing of the Querétaro–San Luis Potosí rail agreement, October 2026Photo: Gobierno del Estado de San Luis Potosí
    237 km

    Passenger rail from Querétaro

    Federal line with a planned "Potosí Industrial" station next to RedMetro in the industrial zone. Right-of-way agreement signed October 2026.28,29

    Circuito Potosí bridge at Valle de los FantasmasPhoto: Gobierno del Estado de San Luis Potosí
    $300M MXN

    Largest vehicle bridge in the state

    Six lanes on Circuito Potosí at Valle de los Fantasmas. Opened June 2026.16

    Circuito Potosí underpass at Av. de las TorresPhoto: Gobierno del Estado de San Luis Potosí
    < 5 months

    Circuito Potosí underpass

    $250M MXN underpass at Av. de las Torres, built in under five months. Opened August 2026.17

    Also under construction: the Vía Alterna extension from Eje 122 to Eje 140, through the Zona Industrial.15

    Workforce

    A young, trained industrial workforce

    1.37M
    Economically active people in the state; unemployment 3.2%30
    Labor force
    259,286
    People working in manufacturing, about 1 in 5 jobs30
    Manufacturing
    32
    Median age in San Luis Potosí31
    Median age

    Most of the engineers who ran this plant came from the Universidad Politécnica and CONALEP.

    UASLPState university: 32,451 students and 742 national-system researchers. 1 in 3 of the state's higher-education students.32,33
    Tecnológico Nacional, SLP1,900+ new students in 2025 across 13 programs, including the state's first AI, semiconductor and logistics engineering degrees.34
    Universidad PolitécnicaEngineering in advanced manufacturing, industrial engineering and IT. 6,125 students in 2022, the latest official count.37,38
    CONALEP5 technical campuses in the state, 2 in industrial zones. 5,442 students in electromechanics, machine tools, mechatronics and quality control (2023).39
    Tec de Monterrey logoUT de San Luis Potosí logo
    70+ more institutionsPublic and private universities and technical schools across the state, including Tec de Monterrey and UT de San Luis Potosí, which runs dual programs with Bosch, Dräxlmaier and other plants.33,40
    Stability

    The investment case for Mexico

    BBB-/ Baa3 / BBB
    Investment grade with Fitch, Moody's and S&P18–20
    Credit rating
    3.45%
    Annual inflation, Sep 2026, inside Banxico's target range21
    Inflation
    US$35B
    Foreign direct investment, first half of 2026, a record23
    FDI
    500,956
    Formal jobs in San Luis Potosí, Aug 2026, a record24
    Jobs
    €800M
    BMW's new investment in its San Luis Potosí plant10
    Anchor investment
    USMCA
    In force, now under annual review by the three countries25
    Trade access
    08Get in touch

    Request the property package

    The package includes photos, drawings, the topographic survey and the 2021 commercial appraisal. Pricing and terms are discussed one-on-one, and site visits can be arranged.

    Chat on WhatsApp

    Request the property package

    Your information is kept confidential and used only to respond to your request.

    Sources and notes
    1. 3M: Expansión, Jun 26, 2025; address: FDA registration
    2. Dräxlmaier: Dräxlmaier supplier guideline
    3. Cummins: Mexico Industry
    4. Mabe: Expansión, Jan 17, 2014
    5. Continental: Cluster Industrial, 2025
    6. Bosch: Cluster Industrial
    7. Valeo: Valeo in Mexico
    8. GM: San Luis Potosí Assembly
    9. Plant locations: OpenStreetMap, read Oct 13, 2026
    10. BMW: New Mobility News, Jul 27, 2026
    11. MetroRed launch: Tus Buenas Noticias, Oct 8, 2023
    12. MetroRed Line 5: Plano Informativo, Sep 16, 2026
    13. Querétaro–SLP train: Proyectos México (Banobras), rev. Oct 12, 2026
    14. Line timing: ADN40, May 27, 2026
    15. Vía Alterna extension: Plano Informativo, Jul 31, 2026
    16. Valle de los Fantasmas bridge: Plano Informativo, Jun 12, 2026
    17. Av. de las Torres underpass: La Razón, Aug 5, 2026
    18. Fitch: Diario de Yucatán, Apr 10, 2026
    19. Moody's: Mexico Business News, May 21, 2026
    20. S&P: Bloomberg Línea, May 2026
    21. Inflation: INEGI, Oct 8, 2026
    22. Policy rate: Banxico, Sep 24, 2026
    23. FDI: Cluster Industrial, citing the Secretaría de Economía, Aug 2026
    24. SLP jobs: Plano Informativo, Sep 10, 2026
    25. USMCA: Basham, Ringe y Correa, Jul 6, 2026
    26. Small-unit sizes in the Zona Industrial and La Pila: Propiedades.com listings; Pincali, Privada Industrial NB modules from ~900 m², read Oct 13, 2026
    27. RedMetro lines: El Heraldo de SLP, Sep 27, 2026
    28. Querétaro–SLP rail, planned Potosí Industrial station: El Universal SLP, Oct 11, 2026
    29. Rail right-of-way agreement: La Crónica, Oct 8, 2026
    30. Labor force and manufacturing jobs: INEGI ENOE, Q2 2026, Aug 25, 2026
    31. Median age: INEGI Encuesta Intercensal 2025
    32. UASLP enrollment and researchers: UASLP academic indicators, Q1 2026
    33. 1 in 3 higher-education students at UASLP; 74 other institutions: UASLP, Jan 26, 2026
    34. Tecnológico Nacional SLP intake and new degrees: Plano Informativo, Sep 10, 2025
    35. Infrastructure photos: Gobierno del Estado de San Luis Potosí press photos, as republished by El Cuarto Poder and La Crónica
    36. Universidad Politécnica programs: UPSLP, Oferta Educativa, read Oct 13, 2026
    37. Universidad Politécnica enrollment: DataMéxico, 2022 data
    38. CONALEP San Luis Potosí campuses, enrollment and careers: CONALEP, Cédulas Descriptivas 2023
    39. UT de San Luis Potosí dual-education partners: UTSLP, Formación Dual (2023 list)
    WhatsApp
    WhatsApp Request package